Checking heat pump quotes for a London church hall
A church hall in London had two very different heat pump quotes and no way to tell which was right. We surveyed the hall at short notice and calculated the heat loss room by room, giving the architect an independent figure to check the quotes against.

At a glance
- An independent heat loss survey to check two contractors' air source heat pump quotes.
- On site two days after booking, with every room measured and the real building materials investigated.
- Two reports at two different room temperatures, so the client could see how the target temperature changes the heating needed.
- A room-by-room split, so heat pumps and any electric heaters could be matched to each space.
- Building
- Church hall with main halls, offices and meeting rooms
- Location
- London
- Client
- Architects, on behalf of the church
- Service
- Site survey and room-by-room heat loss calculation
- Reports
- Two versions, designed at two different room temperatures
- Year
- 2026
The brief
The church wanted to replace the boilers in its hall with air source heat pumps. Two contractors had quoted. One proposed ceiling and wall-mounted units, with electric radiators in the side rooms. The other proposed more wall-mounted units spread around the hall. The architects needed to know how much heat the hall actually needed before choosing.
How we did it
We offered a desktop calculation from plans or a site visit, and the church chose a site visit. We were on site two days after they confirmed. We measured every room and investigated the building materials, which in older buildings are often different from what the drawings show.
We produced two reports, one at a lower and one at a higher room temperature, so the client could see how the target temperature changes the heating needed. Each report gives a room-by-room breakdown and shows the heat lost through each part of the building fabric.
What the client received
- A total heat load for the whole building at each design temperature.
- A room-by-room split, so heat pumps could be sized for the main halls, with electric heaters in the small rooms if that strategy was chosen.
With independent figures, the architect could check each contractor's proposed units against what every room really needs, instead of comparing quotes on price alone.